ACE - ACEX 3114 Commuter Train 05 South | E, Hazelton Ave. Railroad Crossing, Stockton CA
May 15, 2026•Channel
AI Analysis
Data from YouTube Data API v3•Updated Just now
Video Overview
Video Details
Published3 weeks ago
Duration2:59
Video IDea9fYH_eLn8
Languageen
CategoryAutos & Vehicles
PrivacyPublic
Made for KidsNo
Video TypeRegular Video
Performance Metrics
Views669
Likes22
Comments3
Engagement Rate3.74%
Likes per 100 views3.29
Comments per 1K views4.48
Video Tags
Description
April 28, 2026 6:41am
Before heading out to chase on the McHenry former Tidewater, I stopped in Stockton to get a freight video here as I filmed the new signal here a month prior already with an ACE train and needed a freight video now but made it early enough to catch ACE 05 departing so I just filmed it on this side since I need a video period from this side since the new signal was installed here. There was also a pedestrian strike also in Stockton north of here around the area near Morada Ln.
Altamont Commuter Express Train 05 southbound passes through the East Hazelton Avenue railroad crossing on the UP Fresno Sub in Stockton, California.
ACEX 3114
ACEX 3313
- Train 05
Crossing Info
City: Stockton, California
Line/Crossing Signal Owner: Union Pacific Railroad
Line User(s): UP, BNSF, AMTK, ACE
Bell Sequence: Ring till gates start to rise
Right Shoulder Signal - Harmon Cantilever
Lights: 4 pairs = Mast - 3 12x20 inch Electro-Tech LEDs/Harmon Lights & 1 12x20 inch Harmon Dotted LEDs/Harmon Lights, Overhead - 2 pairs of 12x20 inch Electro-Tech LEDs/Harmon Lights
Junction Boxes: Harmon
Cantilever Install: UP Mid To Late 1990s, Installed between 1995 - 1998
- Gated Mast
Bell: NEG E-Bell
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arms: WCH
Base: WCH
Gate Mast Install: UP Late 2000s Equipment As Mid 2010s Install, Installed 2015
Median Signal Close
Bell: WCH E-Bell - Type 3 Sound
Lights: 1 pair of 12x24 inch GE Pixilated Look Dotted LEDs/Safetran Lights
Junction Box: Safetran
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arms: WCH
Base: WCH
Gate Mast Install: UP Late 2000s Equipment As Mid 2010s Install, Installed 2015
Left Gate-less Pedestrian Signal
Bell: WCH E-Bell - Type 3 Sound
Lights: 2 pairs of 12x20 inch WCH 2nd Gen Miller Felpax LEDs/Harmon Lights
Junction Box: Harmon
Base: Harmon
Install: UP Mid 2010s, Installed 2015
Left Shoulder Signal - Harmon Cantilever
Lights: 4 pairs of 12x20 inch Electro-Tech LEDs/Harmon Lights
Junction Boxes: Harmon
Cantilever Install: UP Mid To Late 1990s, Installed between 1995 - 1998
- Gated Mast
Bell: WCH E-Bell - Type 3 Sound
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arms: WCH
Base: WCH
Gate Mast Install: UP Late 2000s Equipment As Mid 2010s Install, Installed 2015
Median Signal Far
Bell: NEG E-Bell
Lights: 1 pair of 12x24 inch GE Pixilated Look Dotted LEDs/Safetran Lights
Junction Box: Safetran
Gate Lights: NEG Clear Gate LEDs "Alstom-Aurora Style"
Mechanism/Counterweight Arms: Siemens
Base: Siemens
Install: UP Mid 2020s with lights from previous signal, Installed 2026
Right Gate-less Pedestrian Signal
Bell: WCH E-Bell - Type 3 Sound
Lights: 2 pairs of 12x24 inch WCH 2nd Gen Miller Felpax LEDs/Harmon Lights
Junction Box: Harmon
Base: Harmon
Install: UP Mid 2010s, Installed 2015
This crossings signals owned by the Union Pacific Railroad is an mixed install. The Cantilevers are SP mid 1990s signal installs with changes overtime to its lights. It's gated masts and close median signal are UP late 2000s signal equipment installed in the mid 2010s with changes overtime being lights added in the early 2020s to medians, gate and gate light changes. The far median signal is an UP mid 2020s signal install with reused lights from the previous signal in that spot. The gateless signals are an UP mid 2010s signal install variant B for gate-less signals.
Camera
Sony FX30 Cinema Line + Tamron 17mm - 300mm
Canon EOS R50 V + Sigma Contemporary 16-300mm F3.5-6.7 DC OS