"Making the bolt holes line up" | SpaceX Starbase
Jan 29, 2026•Channel
AI Analysis
Data from YouTube Data API v3•Updated Just now
Video Overview
Video Details
Published5 months ago
Duration13:07
Video IDlDi9_HKnWK8
Languageen
CategoryScience & Technology
PrivacyPublic
Made for KidsNo
Video TypeRegular Video
Performance Metrics
Views37.6K
Likes3.7K
Comments183
Engagement Rate10.28%
Likes per 100 views9.79
Comments per 1K views4.86
Video Tags
Description
The ASU (Air Separation Unit) under construction at Starbase continues to take shape as it prepares to relieve some of the pressure on propellant demand created by Starship's anticipated launch cadence.
⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
Narration by John "Das" Galloway.
🎥 Video from Ceaser G, Gage, Colleen, and Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy: https://www.nasaspaceflight.com/content-use-policy/
L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 https://forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)
Sections:
Timestamps:
0:00 ASU Skid Arriving
0:43 ASU Skid Installed
1:09 More ASU Parts Arriving
1:34 Loadspreader Rigged to Crane
1:48 ASU Section Installed
2:41 Pad 1 Ground Work Continues
4:09 Pad 2 FireX Tested
4:36 Pad 2 Deluge Test
4:55 Pad 2 Perimeter Wall Construction
5:28 The Production Site
5:43 Gigabay Construction
6:53 Apartment Building Construction
7:13 The Office Building
7:31 Coyote Outside Starfactory
7:46 Ship 40’s Nosecone
8:21 Ship 41’s Nosecone COPVs
8:32 Second Ship Static Fire Stand
8:52 Booster Transport Stand
9:15 Construction Across Highway 4
10:01 Masseys Test Site
10:10 B18.1 and B18.3 Test Tanks
10:28 B18.3’s Crushed Section
10:37 Crane Hooked to Skirt on B18.3
11:05 Skirt Section Removed From B18.3
11:15 S39.1 Test Tank
11:34 Masseys Truss Structure
12:00 Massey Way Construction
LDAPAABJRG2UMCU3